QUALITY PLAN

We ensure to identify the quality standards relevant to the project and decide how to meet the standards. We follow the British, American, and Indian standards for choosing the basic parameters while designing or selecting equipment needed for the project.

We ensure to abide by the tender and technical specifications of a BOQ and rarely do we deviate.

IMPROVISING QUALITY

We engage our team to follow a directive that leads to continuous improvement by measuring quality at every stage and identifying quality issues and initiating its improvements.

Collecting such data to create an improved line of process adapting and adhering to the system or project requirements

QUALITY CONTROL

We ensure to check and focus more on the intrinsic qualities of any raw material being procured. We also opt to go for destructive testing of raw material when required.

We choose to observe zero negative tolerance while selecting any material, equipment, or designing any systems. Our suppliers have always been consistent during the integrity test of deliverables

QUALITY ASSURANCE

For products being manufactured by us, we always aim to produce consistent and fine quality products having minimum tolerances.

Not only do we ensure to quality conformance of our products but we also ensure to conform to the quality of the product used even during service.

PROCUREMENT

The following aspects to be Monitored while procuring materials

Approved Shop Drawings

Approved Technical Submittals

Selection / Model no

Technical Specifications of Material

Operating Parameters of Equipment

Delivery Period based on completion schedule

Monitoring of delivery within agreed schedule

ERECTION

Erection works proceed after the following

Ensuring all safety mandates at site for proper material handling

Sample Approval and Mock-up Approval

Condition check of Material after Un-packing

Make, Model no. and quantity as per Approved drawing, Technical submittal, BOQ and as per Tender Specifications

testing of Equipment's as per Specs

Commissioning of tested Equipments

Handover of Projects